Regularization of the Lower Mondego

Project overview

1990
Europe
Engineering and Construction

Regularization of the Mondego River bed in its alluvial final stretch between the cities of Coimbra and Figueira da Foz, in a stretch of about 40 km, which included the excavation works executed by dredging and with cut/suction/ repulsion equipment. The goal was to improve the farming conditions in neighbouring areas. This project transformed the Centre in one of the main projects of the 20th Century in Portugal.