Refurbishment of the medium voltage network, transformer substations and emergency electric plants of the Faro Airport, in Algarve. To ensure the proper operation of the system, it was installed a command and control system, installing communication frames and work stations in every transformer substations, with communication guaranteed by two fibre-optic rings.
