Design and build of a 23km section of Highway S19 between the “Lubartów Pólnoc” and “Lublin Rudnik” junctions. Planned duration of construction work is 36 months.
 
	 
	Design and build of a 23km section of Highway S19 between the “Lubartów Pólnoc” and “Lublin Rudnik” junctions. Planned duration of construction work is 36 months.
 
		
			 
		
			